Green Hill
Footbridge
Madison, CT
In designing the bridge and planning its construction, we worked to minimize its environmental impact. The offsite prefabrication of nearly all components and their careful installation from staging areas outside of the wetland areas dramatically reduced assembly time and the associated heavy foot or machine traffic of more typical site-built projects.
Using a 50-ton crane with a 190-foot boom and extension, a tree crew that climbed and tied back major branches of large trees to prevent their damage as the riggers wove the 70-foot sections through the forest and down into the gorge, and a skilled crew that was well-versed in the assembly process, we were able to deliver, install, and stabilize the bridge deck in one day.From that moment on, the bridge deck itself was the stage from which all finishing could be carried out, above and away from the delicate ecology of the brook and forest.